Housing numbers influence how much development land councils need to identify, but the expression “housing target” can refer to several different figures.

The national standard method calculates a minimum annual local housing need figure. The Local Plan then establishes a housing requirement after considering land availability, constraints, infrastructure and strategic planning matters.

Five-year housing land supply asks whether enough deliverable sites exist looking forward. The Housing Delivery Test measures completed homes looking backwards. These calculations are connected but they are not interchangeable.

A rising housing figure can create pressure to identify additional sites, review settlement strategies or reconsider land previously rejected. It does not, however, remove the need for a suitable location, safe access and manageable constraints.

At Value My Land, we review housing evidence alongside the Local Plan stage, Call for Sites opportunities and the planning and technical characteristics of the land.

Get Your Quick, Free & Easy Land Review TODAY

Send us the location of your land for a free initial development review

Important Definitions

Housing Need, Housing Requirement and Delivery Are Different

The expression “housing target” is widely used, but several distinct figures sit behind it. Understanding the difference prevents Local Plan, supply and delivery evidence from being confused.

Local Housing Need

Local housing need is the minimum annual figure produced by the national standard method, unless a justified alternative approach applies in specific circumstances.

It is an unconstrained assessment of need and does not itself decide how many homes the adopted plan will provide.

Housing Requirement

The housing requirement is the minimum number of homes the development plan seeks to provide over the plan period. It follows assessment of need, land availability, constraints, unmet need and the strategy selected through plan-making.

It may be higher than the standard-method figure where the authority plans for additional growth.

Supply and Delivery

Five-year housing land supply asks whether enough deliverable sites exist looking forward. The Housing Delivery Test asks whether enough homes were actually delivered looking backwards.

Neither calculation is the same as the standard-method assessment of housing need.

A council can have a high local housing need, a different adopted housing requirement, a five-year supply shortfall and a Housing Delivery Test result—all at the same time. Each figure answers a different question.

Current Policy Position

The National Position From 17 August 2026

The final August 2026 NPPF now contains the standard method, housing-supply rules and Housing Delivery Test consequences within policies HO1 to HO7 and Annex D.

Policy HO1 requires the housing need assessment to establish the overall number of homes needed as a minimum using the standard method in Annex D. The method retains a baseline equal to 0.8% of the latest dwelling stock and an affordability adjustment based on the mean of the five most recent median workplace-based affordability ratios.

Policy HO2 then distinguishes the local housing need figure from the housing requirement in the development plan. A requirement should reflect the extent to which need can be accommodated and can be higher where neighbouring needs, economic growth or infrastructure investment justify additional homes.

Policy HO3 requires a sufficient supply and mix of sites, including five years of specific deliverable sites with the appropriate Annex D buffer and a trajectory for later years. Policy HO7 gives substantial weight to the benefits of homes that contribute towards evidenced accommodation needs, including the different groups identified under HO1.

A failure to demonstrate the required five-year supply, or a Housing Delivery Test result below 75%, can evidence unmet housing need for policy S5(1)(j). That route concerns qualifying development outside settlements and requires the proposal to be physically well-related to a settlement and appropriately scaled for infrastructure. Within settlements, policy S4 applies. Green Belt proposals must follow policies GB6 to GB8 rather than treating S5 as the permission route.

Annex A also protects certain recently adopted housing requirements from being treated as evidence of unmet need for S5(1)(j) for five years where the authority can demonstrate the required supply and Housing Delivery Test performance exceeds 75%. The adopted date, policy basis and latest monitoring evidence should therefore be checked together.

For plan-making, the applicable framework depends on the legal route. Plans being prepared under the 2026 regulations and spatial development strategies use the August 2026 NPPF, while some legacy plans continue under the December 2024 framework and its transition provisions.

Use the latest dwelling-stock and affordability data for the standard method, then check the adopted or emerging housing requirement, Annex D supply calculation, Housing Delivery Test result and the plan’s transition status.

Read the final National Planning Policy Framework.

The Standard Method

How the Minimum Annual Local Housing Need Figure Is Calculated

The current method contains two principal steps. It produces a minimum annual need figure rather than an adopted Local Plan requirement.

Step 1

Find Existing Housing Stock

Use the most recent published dwelling-stock figure for the local authority area, including vacant dwellings where the official table provides them.

Step 2

Calculate the 0.8% Baseline

Multiply the housing-stock figure by 0.008. This ensures every area contributes a baseline proportionate to the size of its existing housing market.

Step 3

Calculate Affordability

Use the mean average of the five most recent median workplace-based affordability ratios. No uplift applies where the average ratio is 5 or below.

Step 4

Apply the Adjustment

Where the ratio exceeds 5, apply the national formula and multiply the housing-stock baseline by the resulting adjustment factor.

The standard method is deliberately formula-based. It does not attempt to allocate sites, test Green Belt, assess infrastructure capacity or determine whether the resulting homes can all be accommodated within the authority.

Worked Example

A Simplified Standard-Method Calculation

This example illustrates the mechanics using rounded hypothetical figures. It is not a calculation for any particular council.

StageCalculationIllustrative Result
Existing housing stockAssume the authority has 80,000 dwellings in the latest published stock table.80,000 dwellings
Baseline80,000 × 0.8%.640 homes per year
Five-year average affordability ratioAssume the average workplace-based affordability ratio is 8.Ratio of 8
Adjustment factor((8 − 5) ÷ 5) × 0.95 + 1.1.57
Minimum annual local housing need640 × 1.57.Approximately 1,005 homes per year

Where the five-year average affordability ratio is 5 or below, no affordability uplift is applied. Where it is higher, the uplift increases progressively as affordability worsens.

Why These Inputs Are Used

Housing Stock and Affordability Serve Different Purposes

The method combines a stable baseline with a price signal intended to direct more homes towards less affordable areas.

Existing housing stock creates a consistent baseline. Larger housing markets begin with a larger absolute figure, while every authority contributes at least 0.8% of its stock before any affordability adjustment is applied.

The affordability ratio compares workplace earnings with house prices. A higher ratio indicates that homes cost more in relation to local earnings. The uplift is intended to respond to that pressure and support the national objective of significantly increasing housing supply.

The method uses a five-year average rather than one annual ratio. This reduces the effect of a single unusual year, although the figure can still change when new data replace the oldest year in the average.

The output is not a forecast of exactly how many households will form or exactly how many homes the market will build. It is a policy method for establishing the minimum number of homes that authorities are expected to plan for at the need-assessment stage.

It is also not a site-capacity exercise. An authority with a high need figure may still need to test urban capacity, brownfield land, settlement growth, infrastructure, environmental constraints and cooperation with neighbouring areas before setting its spatial strategy.

Housing need is deliberately assessed before constraints. The Local Plan process then decides how that need should be translated into a deliverable requirement and distribution of growth.

From Need to Requirement

How a Council Sets Its Local Plan Housing Requirement

After the standard method establishes need, the authority must determine the amount and distribution of housing that the plan will seek to provide.

The authority reviews land availability, settlement capacity, infrastructure, environmental designations, Green Belt, flood risk, landscape, heritage and other constraints. It should also consider whether neighbouring areas are unable to meet their own need and whether some unmet need must be accommodated.

A housing requirement can be higher than the local housing need figure. An authority may plan for additional economic growth, regeneration, affordable housing, strategic infrastructure or other policy ambitions that justify more homes.

Where an authority proposes to provide less than the assessed need within its own area, that position requires robust evidence and strategic cooperation. The examination route now depends on the plan’s transition status. A legacy plan submitted by the end of 2026 is examined for legal compliance and soundness under the established system. A plan prepared under the new system follows the 30-month process, three gateways and the new examination procedure. In either case, the housing strategy must be supported by evidence and a credible route to delivery.

The total requirement is then translated into a trajectory across the plan period. Strategic policies should generally look ahead over at least fifteen years from adoption, although the exact distribution can involve annual averages, stepped requirements or strategic phasing.

The adopted requirement becomes important for monitoring, five-year supply and, depending on the relevant rules, the Housing Delivery Test. Emerging plan figures can also affect how much land is sought through Calls for Sites and how candidate sites are assessed.

Evidence Commonly Considered

Urban and Brownfield Capacity

What can be delivered within existing settlements and on previously developed land.

Land Availability

The scale, location, suitability, availability and achievability of candidate sites.

Infrastructure

Schools, healthcare, transport, utilities, drainage and strategic investment.

Environmental Constraints

Green Belt, flood risk, landscape, ecology, heritage and agricultural land.

Neighbouring Needs

Whether unmet need should be redistributed through strategic planning arrangements.

Economic and Affordable Housing

Whether additional housing is needed to support jobs, regeneration or particular tenures.

The standard-method figure is the starting point for need. The housing requirement is a plan-making outcome that should be supported by evidence and sufficient sites.

Housing Mix and Tenure

The Headline Number Is Not the Whole Housing Need

Councils also assess which homes are needed, not only the total number.

Affordable Housing

Evidence should assess the need for affordable housing, including the scale and types of provision required. Policy then determines how qualifying development contributes.

Affordable housing need does not simply replace the standard-method total; it informs tenure and delivery within the broader housing strategy.

Different Household Groups

Plans should consider older people, families, students, people with disabilities, those who rent, self-builders, travellers and other groups with specific housing requirements.

The evidence can influence size, accessibility, tenure, location and specialist accommodation.

Dwelling Type and Density

Need evidence and local character influence the balance of houses, flats, smaller units and larger family homes.

Density policy also affects how much land is required to meet the overall housing requirement.

Employment and Economic Growth

Housing can support labour supply and economic strategy. Authorities may consider planning above minimum need where growth ambitions justify it.

Employment land, transport investment and housing distribution should therefore be coordinated.

Older Persons and Specialist Housing

Specialist housing may contribute to the overall supply while meeting particular care, accessibility or support needs.

The way communal accommodation is counted can differ between planning evidence, supply and delivery monitoring.

Self-Build and Custom Build

Authorities maintain registers and should consider demand for serviced plots as part of their housing strategy.

Suitable land may therefore support a broader mix than conventional market housing alone.

A site can be valuable to a Local Plan because it helps deliver the right type, tenure or location of housing—not only because it adds to the raw unit total.

Land Requirement

How Housing Numbers Create a Need for Development Sites

Once the housing requirement is established, councils must identify a supply of land capable of delivering it over the plan period.

The council cannot convert a housing number into acreage using one fixed density. Urban land, town-centre sites, suburban extensions, villages and strategic settlements can support very different densities and housing mixes.

Gross site area is not the same as net residential area. Roads, drainage, landscape buffers, biodiversity, open space, schools, utilities and other infrastructure reduce the land available for homes. Constraints can also reduce capacity below an initial desktop estimate.

The plan should contain a mix of sites and maintain flexibility. Heavy reliance on a few large strategic allocations can create delivery risk if infrastructure, land assembly or technical work is delayed. Small and medium sites may help diversify the trajectory and produce homes earlier.

Windfall development can contribute where there is compelling evidence that it will provide a reliable source of supply. However, the assumptions should reflect historic delivery and avoid double counting land already included elsewhere.

Councils therefore use Calls for Sites, HELAA or SHLAA work, brownfield registers, urban-capacity studies and site-selection processes to identify options. A high or increasing housing requirement can make additional well-located land more important.

A council may need substantially more gross land than a simple homes-per-acre calculation suggests because not every submitted site will be selected and not every allocated hectare will be developable.

Monitoring the Strategy

How Need, Supply and Delivery Interact

After the plan sets the requirement, separate monitoring tools test whether enough suitable land exists and whether homes are being completed.

Five-Year Housing Land Supply

This is a forward-looking assessment of whether the authority has enough deliverable housing sites against the applicable requirement or need figure.

A shortfall can affect decision-making and the weight given to relevant policies.

Housing Delivery Test

This is a backward-looking comparison of homes delivered with homes required over the relevant rolling period.

Under-delivery can trigger an action plan and a 20% supply buffer. A result below 75% is also deemed to evidence unmet housing need for policy S5(1)(j).

Local Plan Review

The authority should keep policies and evidence under review. Updated need, delayed allocations or infrastructure change may require additional land or a revised distribution.

Landowners should monitor plan timetables and consultation stages rather than relying only on the adopted plan.

A sound Local Plan is not the end of the process. Housing need data, site delivery and policy circumstances continue to change, which can create new planning opportunities or expose weaknesses in the existing strategy.

Landowner Implications

What a Higher or Changing Housing Figure Can Mean for Land

An increased need figure does not allocate land automatically, but it can alter the scale of the planning challenge and the authority’s search for sites.

Where the existing plan does not provide enough homes to meet the updated need, the council may need to review its strategy, expand settlements, identify new growth areas or reconsider land previously rejected.

The strongest opportunities are generally well-related to existing settlements, capable of safe access and able to address flood risk, drainage, ecology, landscape, heritage and infrastructure. A numerical shortfall does not remove those requirements.

Timing matters. A landowner who waits until preferred allocations are published may have missed earlier Call for Sites, evidence-gathering and consultation opportunities. Promotion should begin when the evidence base and spatial options are being formed.

A site submission should not rely only on the headline housing figure. It should explain how the land helps meet need in a sustainable location, whether it is available, what capacity it can support, which constraints have been reviewed and how development could be delivered.

Housing figures also affect valuation indirectly. A stronger policy need can improve planning prospects, but value depends on whether the site can secure an acceptable permission and deliver homes after infrastructure, affordable housing, conditions and abnormal costs are considered.

Signals Worth Monitoring

Updated Standard-Method Figure

A material increase may alter the scale of land required in the next plan.

Local Plan Timetable

Issues, options, preferred strategy and submission stages create different opportunities.

Call for Sites

The formal opportunity to put land into the council’s evidence and assessment process.

HELAA or SHLAA Results

Shows how the authority has assessed suitability, availability, achievability and capacity.

Five-Year Supply Position

Can reveal immediate decision-making pressure outside the longer-term plan review.

Housing Delivery Test

Can show whether the adopted strategy is producing completed homes at the required rate.

Housing need creates strategic pressure, but a landowner still needs a credible site-specific case. Numbers and site evidence should be presented together.

Promotion Strategy

How to Respond to Emerging Housing Requirements

A proportionate promotion strategy can place land in the evidence base before spatial decisions are fixed.

Stage 1

Confirm the Relevant Figures

Identify the latest standard-method need, adopted requirement, emerging plan figure, five-year supply position and Housing Delivery Test result.

Stage 2

Review the Site

Assess settlement relationship, access, flood risk, drainage, ecology, landscape, heritage, utilities and indicative capacity.

Stage 3

Submit and Represent

Respond to Calls for Sites and consultations with a clear planning case, accurate boundary, availability evidence and proportionate technical support.

Stage 4

Maintain Deliverability

Update evidence, address council concerns and show that the site can progress within the plan period rather than remaining a theoretical option.

The objective is to show not merely that more homes are needed, but that this particular land represents a suitable, available, achievable and strategically sensible way to help meet that need.

Free Initial Development Review

Find Out Whether Changing Housing Requirements May Create an Opportunity for Your Land

Send us the location and approximate boundary of your land. We can review the relevant authority, Local Plan stage, housing evidence and the principal site constraints.

You do not need an allocation or complete technical file before contacting us. A postcode, map pin, what3words reference or site plan is normally enough for the first review.

Development Land and Planning Resources

Related Guides

These guides distinguish housing need from supply, delivery, plan-making and site selection, helping landowners understand where a numerical requirement fits within the wider planning process. The delivery of serviced plots and local demand registers are considered in Land for Self-Build and Custom-Build Housing.

Frequently Asked Questions About Housing Need and Housing Targets

What is local housing need?

Local housing need is the minimum annual number of homes identified through the national standard method, unless a justified alternative approach applies in specific circumstances. It is an unconstrained assessment used to inform strategic plan-making.

It is not automatically the same as the adopted Local Plan housing requirement.

What is a housing requirement?

The housing requirement is the minimum number of homes that the development plan seeks to provide over its plan period. It is set after considering assessed need, land availability, constraints, unmet need and the chosen growth strategy.

It can be higher than the standard-method need figure.

How is the current standard method calculated?

The method starts with 0.8% of the authority’s latest housing stock. It then applies an affordability adjustment using the five-year average of the median workplace-based affordability ratio.

No uplift applies where the average ratio is 5 or below.

What is the affordability formula?

Where the five-year average affordability ratio is above 5, the adjustment factor is: ((ratio minus 5) divided by 5) multiplied by 0.95, plus 1. The housing-stock baseline is multiplied by that factor.

The calculation should use the latest official input data.

Why is housing stock used instead of household projections?

The current method uses housing stock to provide a stable baseline proportional to the size of each authority’s existing housing market. The affordability adjustment then directs a larger uplift to areas where house prices are high relative to workplace earnings.

This formula was introduced in December 2024 and is now incorporated into Annex D of the final August 2026 NPPF.

Does the standard method produce the final housing target?

No. It produces the minimum annual local housing need figure. The Local Plan process then determines the housing requirement and spatial strategy after considering land, constraints, infrastructure and strategic matters.

“Housing target” is often used informally to describe one of these different figures.

Can a council plan for more homes than the standard method?

Yes. National guidance supports authorities that plan for higher growth, for example to reflect economic ambitions or other strategic objectives. The adopted requirement can therefore exceed the assessed minimum need.

The plan must still identify a credible strategy and sufficient land.

Can a council plan for fewer homes than its need?

A plan may propose to accommodate less than the assessed need within the authority where robust evidence shows that constraints or other circumstances justify that approach. Strategic cooperation and consideration of unmet need are then important.

The position is examined through the plan-making process and should not be assumed merely because land is constrained.

How often does the local housing need figure change?

The input data change over time. Dwelling-stock estimates are generally updated annually, usually in May, and affordability ratios annually, usually in March. Authorities should keep the figure under review during plan-making.

A calculation used at submission may be relied upon for a defined period under current guidance.

How does housing need differ from five-year supply?

Housing need estimates the minimum homes to plan for. Five-year housing land supply tests whether enough deliverable sites exist for the next five years against the applicable requirement or need figure.

One is a need calculation; the other is a land-supply assessment.

How does housing need differ from the Housing Delivery Test?

The Housing Delivery Test compares actual completed homes with homes required over a past rolling period. Local housing need is a forward-looking plan-making input.

A council can have a high need figure and also under-deliver against its existing requirement.

Does a higher housing need mean my land will be allocated?

No. A higher figure can increase the amount of land required, but the council still assesses location, policy, access, flood risk, drainage, ecology, landscape, heritage, infrastructure and deliverability.

The land must be promoted with site-specific evidence.

How much land is needed to meet a housing target?

There is no fixed conversion. Density, housing mix, site constraints, infrastructure, open space, drainage and non-residential uses all affect capacity. Councils also need contingency because not every site will deliver exactly as expected.

Gross land requirements are therefore larger than a simple net density calculation may suggest.

What is unmet housing need?

Unmet need is housing need that cannot be accommodated within the originating authority’s strategy. Strategic planning may examine whether neighbouring areas or a wider spatial strategy can accommodate some of that need.

The outcome depends on evidence, cooperation, constraints and plan-making arrangements.

When should a landowner promote land?

Promotion should begin while the authority is gathering evidence and considering spatial options, not only after preferred allocations are selected. Calls for Sites, HELAA work and early Local Plan consultations are important opportunities.

The submission should combine housing evidence with a credible site-specific case.

Free Development Potential Review

Find Out Whether the Housing Evidence May Affect Your Land

Request a free initial review of the Local Plan position, housing evidence and the principal planning and technical considerations affecting your site.

Free Initial Land Review

Contact Information

Office

13 Ensign Business Centre
Westwood Way
Coventry
CV4 8JA